책 이미지
![[eBook Code] Guidelines for Process Safety During the Transient Operating Mode](/img_thumb2/9781119529217.jpg)
책 정보
· 분류 : 외국도서 > 기술공학 > 기술공학 > 생화학
· ISBN : 9781119529217
· 쪽수 : 288쪽
· 출판일 : 2021-01-28
목차
List of Figures xi
List of Tables xiii
Acronyms and Abbreviations xv
Glossary xvii
Acknowledgments xxiii
Dedication xxv
Foreword xxvii
Preface xxxi
1 Introduction 1
1 1 Introduction 1
1 2 Scope 1
1 3 Audience 5
1 4 Benefits 6
1 5 Applying CCPS Risk Based Process Safety (RBPS) 6
1 6 Incident discussions and guidance 7
1 7 Framework 8
2 Defining the Transition Times 16
2 1 Introduction 16
2 2 Defining the modes of operation 16
2 3 Responses to deviations during operations 17
2 4 A start-up incident 23
Contents vi
Part I—Normal Operations
3 Normal Operations 29
3 1 Introduction 29
3 2 The normal operation 29
3 3 Procedures 37
3 4 Performing a normal shut-down 39
3 5 Start-up after a normal shut-down 40
3 6 Incidents and lessons learned 41
3 7 How the RBPS elements apply 43
4 Process Shutdowns 45
4 1 Introduction 45
4 2 The process shutdown 46
4 3 Projects requiring equipment or process unit shutdowns 48
4 4 A brief project life cycle phase overview 52
4 5 Preparing for planned project-related shutdowns 62
4 6 Start-up after planned project-related shutdowns 66
4 7 Incidents and lessons learned 69
4 8 How the RBPS elements apply 72
5 Facility Shutdowns 73
5 1 Introduction 73
5 2 The facility shutdown 73
5 3 Projects requiring a process unit or facility project-related shutdown 75
5 4 Preparing for a facility project-related shutdown 80
5 5 Start-up after a facility project-related shutdown 81
Contents vii
5 6 Incidents and lessons learned 83
5 7 How the RBPS elements apply 95
Part II—Abnormal and Emergency Operations
6 Recovery 99
6 1 Introduction 99
6 2 Recovering from an abnormal operation 99
6 3 Anticipating abnormal operations 100
6 4 Managing abnormal operations 103
6 5 Incidents and lessons learned 110
6 6 How the RBPS elements apply 113
7 Unscheduled Shutdowns 115
7 1 Introduction 115
7 2 Unscheduled shutdowns 115
7 3 Anticipating and preparing for unscheduled shutdowns 116
7 4 Start-up after activating an unscheduled shut-down 119
7 5 Managing unscheduled shutdowns caused by natural hazard events 121
7 6 Incidents and lessons learned 126
7 7 How the RBPS elements apply 139
8 Emergency Shutdowns 141
8 1 Introduction 141
8 2 Emergency shutdowns 141
8 3 Safely responding to an incident 142
8 4 Anticipating and preparing for shut-downs in an emergency 143
8 5 Start-up after an emergency shutdown 150
Contents viii
8 6 Incidents and lessons learned 153
8 7 How the RBPS elements apply 156
Part III—Other Considerations
9 Other Transition Time Considerations 159
9 1 Introduction 159
9 2 A Life Cycle overview 160
9 3 Commissioning and initial start-up considerations 167
9 4 Incidents and lessons learned, commissioning and initial start-ups 174
9 5 End-of-life shut-down considerations 179
9 6 Mothballing considerations 182
9 7 Incidents and lessons learned, mothballing 183
9 8 Decommissioning considerations 184
9 9 Incidents and lessons learned, decommissioning 185
9 10 How the RBPS elements apply 186
10 Risk Based Process Safety (RBPS) Considerations 187
10 1 Introduction 187
10 2 An RBPS Overview 189
10 3 Applying RBPS to each transient operating mode 194
10 4 Effects of weak operational discipline 204
10 5 Approach for improving process safety performance 205
Appendix A 209
Transient operating modes: incident review and guidance 209
A 1 Introduction 209
A 2 Review of incidents during transient operating modes 209
A 3 Managing the unexpected during transient operating modes 223
References 237
Index 250