logo
logo
x
바코드검색
BOOKPRICE.co.kr
책, 도서 가격비교 사이트
바코드검색

인기 검색어

실시간 검색어

검색가능 서점

도서목록 제공

Guidelines for the Design, Operation and Maintenance of Multi-buoy Moorings

Guidelines for the Design, Operation and Maintenance of Multi-buoy Moorings (Paperback, 1st)

Oil Companies International Marine Forum (지은이)
  |  
Amer Nautical Services
2010-07-31
  |  
424,120원

일반도서

검색중
서점 할인가 할인률 배송비 혜택/추가 실질최저가 구매하기
알라딘 424,120원 -0% 0원 12,730원 411,390원 >
yes24 로딩중
교보문고 로딩중
notice_icon 검색 결과 내에 다른 책이 포함되어 있을 수 있습니다.

중고도서

검색중
로딩중

e-Book

검색중
서점 정가 할인가 마일리지 실질최저가 구매하기
로딩중

해외직구

책 이미지

Guidelines for the Design, Operation and Maintenance of Multi-buoy Moorings

책 정보

· 제목 : Guidelines for the Design, Operation and Maintenance of Multi-buoy Moorings (Paperback, 1st) 
· 분류 : 외국도서 > 기술공학 > 교통수단 > 내비게이션
· ISBN : 9781856093613
· 쪽수 : 112쪽

목차

Introduction

List of Figures

List of Tables

Glossary of Terms and Abbreviations

Bibliography

Section 1

Description of Multi Buoy Moorings

1.1 General

1.1.1 Conventional Buoy Moorings (CBMs)

1.1.2 All Buoy Moorings (ABMs)

1.1.3 Mooring Leg Components

1.1.4 Cargo Transfer System

1.2 Design Limitations of MBMs

1.3 Comparisons with Fixed Berths (Piers and Sea Islands)

1.4 Comparisons with SPMs

1.5 Required Support Facilities

Section 2

Design of Multi Buoy Moorings

2.1 Preliminary Design Considerations

2.1.1 Conceptual Assessment of Proposed Terminal

2.1.2 General Considerations

2.1.3 Selection of MBM Configuration

2.1.4 Products to be Handled

2.1.5 Design Tankers

2.1.6 Environmental Data

2.1.7 Hydrographic, Geotechnical and Geophysical Surveys

2.2 Site Selection, MBM Orientation and Layout 14

2.2.1 General

2.2.2 Use of Ship’s Anchors

2.2.2.1 Holding Power of Ship’s Anchors

2.2.2.2 Minimum Length of Anchor Chain for Ship’s Anchors

2.2.3 Provision of Adequate Manoeuvring Room

2.2.4 Provision of Adequate Water Depth

2.2.4.1 Transit UKC

2.2.4.2 Berth UKC

2.2.4.3 Seabed Obstructions

2.2.4.4 Current Effects

2.2.4.5 Regulatory Requirements

2.3 Mooring Load Analysis

2.3.1 Factors Effecting Mooring Loads

2.3.2 Ship Response to Waves

2.3.3 Effect of Wind and Current

2.3.3.1 Wind Loads on the Ship

2.3.3.2 Current Loads on the Ship

2.3.4 Ship Movement

2.3.5 Selection of Design Safe Working Load

2.3.6 Analysis Methodology

2.4 Mooring Buoy and Hook Design

2.4.1 General Buoy Requirements

2.4.2 Buoyancy Requirements

2.4.3 Description of Buoys for MBMs

2.4.3.1 Structural Buoys

2.4.3.2 Trunk Buoys

2.4.4 Mooring Hooks

2.4.4.1 Quick Release Hooks

2.5 Anchor Chain Leg Design

2.5.1 General

2.5.2 Design of Chain Leg

2.5.2.1 Type and Grade of Chain

2.5.2.2 Joining Shackles

2.5.2.3 Swivels

2.5.2.4 Sinker Blocks at MBM Berths

2.5.3 Safety Factors

2.5.4 Allowances for Corrosion, Abrasion and Wear

2.5.5 Load Transfer to Anchor Points

2.6 Anchor Point Design

2.6.1 General

2.6.1.1 Anchor Point Safety Factors

2.6.2 Drag Embedment Anchors

2.6.2.1 Holding Power of Drag Embedment Anchors

2.6.3 Plate Anchors

2.6.4 Gravity Anchors

2.6.5 Pile Anchors

2.6.6 Holding Power of Chain on Sea Floor

2.6.7 Advantages and Disadvantages of Different Types of Anchor 34

2.7 Hose System Design

2.7.1 General

2.7.2 Number of Hose Strings

2.7.3 Hose Characteristics

2.7.3.1 Flow Rates

2.7.3.2 Lifting Considerations

2.7.3.3 Presentation Flange

2.7.4 Length of Hose String

2.7.5 Hose String Configuration

2.7.5.1 Electrical Isolation

2.8 Pipeline End Manifold (PLEM)

2.8.1 General Requirements

2.8.2 PLEM Location

2.8.3 PLEM Design

2.8.3.1 PLEM Structure

2.8.3.2 PLEM Piping

2.9 Ancillary Equipment

2.9.1 Marker Buoys

2.9.2 Pick-up Buoys

2.9.3 Navigational and Buoy Lights

2.9.4 Methods of Hose Connection

2.9.5 Marine Breakaway Couplings

2.9.6 Use of Shore Wires and Ropes

2.10 Coating Systems

2.10.1 General

2.10.2 Hardware

Section 3

Operation of Multi Buoy Moorings

3.1 Health, Safety and the Environment (HSE)

3.1.1 HSE Policy

3.1.2 Standard Operating Procedures

3.1.2.1 Environmental Limits

3.1.3 HSE Management System

3.1.4 Security

3.1.5 Risk Assessment

3.1.6 HSE Audits

3.1.7 Incident Reporting

3.1.8 Exercises and Drills

3.1.9 Terminal Manning

3.2 Nomination and Vessel Acceptance Criteria

3.3 Pre-Arrival Procedures

3.3.1 Advice to Arriving Ships

3.3.2 Actions Prior to Ship’s Arrival

3.3.3 Pre-Mooring Conference

3.4 Approach to Berth and Preparations

3.5 Berthing and Mooring Operations

3.5.1 Environmental Limits for Berthing

3.5.2 Approach Speed and Anchoring

3.5.3 Working with Mooring Launches

3.5.4 Berthing and Mooring at a CBM

3.5.5 Berthing and Mooring at an ABM

3.6 Safety While in the Berth

3.6.1 Pre-Transfer Procedures

3.6.1.1 Ship/Shore Safety Check-List

3.6.1.2 Communications

3.6.1.3 Agreed Transfer Procedures

3.6.1.4 Emergency Shut Down Procedure

3.6.2 Environmental Limits While in the Berth

3.6.3 Onboard Supervision of Operations

3.6.4 Precautions against Tanker Break-out from Berth

3.7 Hose Connection and Disconnection

3.7.1 Position of Hose on the Seabed

3.7.2 Hose Handling

3.7.3 Hose Lifting and Connection

3.7.4 Method of Lowering the Hose to the Seabed using a Launch

3.8 Departure from the Berth

Section 4

Inspection and Maintenance of Multi Buoy Moorings

4.1 General

4.2 Methods of Inspection

4.2.1 Pre-Berthing Visual Inspections

4.2.2 In-Service Inspections (Time-Based inspections)

4.2.3 Out of Water Inspections (Time-Based/ Condition-Based Inspections)

4.3 Mooring Buoys

4.3.1 General Description

4.3.2 Inspection and Maintenance

4.3.2.1 Mooring Buoy Position

4.3.2.2 Connections on Buoy for Chain and Hooks

4.3.2.3 Mooring Buoy Body

4.3.2..4 Leak Test

4.3.2.5 Mooring Buoy Freeboard

4.3.2.6 Coating

4.3.2.7 Cathodic Protection

4.3.2.8 Mooring Hooks

4.3.2.9 Shore Moorings

4.3.2.10 Fenders

4.4 Anchor Chains

4.4.1 General Description

4.4.2 Inspection and Maintenance

4.4.2.1 Anchor Chains

4.4.2.2 Concrete Sinker Blocks

4.5 Anchors Points

4.5.1 General Description

4.5.2 Inspection and Maintenance

4.5.2.1 Visual Inspection

4.5.2.2 Anchor Proof Test

4.6 Hose Systems

4.6.1 General Description

4.6.2 Inspection

4.6.2.1 Hydrostatic Pressure Test

4.6.2.2 Vacuum Test

4.6.2.3 Electrical Test

4.6.2.4 Marine Breakaway Couplings

4.7 Pipeline End Manifold (PLEM)

4.7.1 General Description

4.7.2 Inspection

4.7.2.1 PLEM Piping

4.7.2.2 Subsea Valves and Actuators

4.7.2.3 PLEM Structure

4.8 Ancillary Equipment

4.9 Spare Parts


Appendices 1 and 2

1 Example Hose Lifting Method
2 Example Hose Lowering Method

저자소개

Oil Companies International Marine Forum (지은이)    정보 더보기
펼치기
이 포스팅은 쿠팡 파트너스 활동의 일환으로,
이에 따른 일정액의 수수료를 제공받습니다.
도서 DB 제공 : 알라딘 서점(www.aladin.co.kr)
최근 본 책