책 이미지

책 정보
· 분류 : 외국도서 > 과학/수학/생태 > 과학 > 물리학 > 전자기학
· ISBN : 9781119770985
· 쪽수 : 304쪽
· 출판일 : 2021-10-05
목차
Preface
SECTION I: INTRODUCTION TO ELECTROMAGNETIC THEORY
1. Introduction
2. Electromagnetic Theory: an outline
2.1 Ground Penetrating Radar (GPR): operative principles and theory
2.2. Frequency Domain Electro Magnetic Method (FDEM): operative principles and theory
2.3. Time Domain Electro Magnetic (TDEM) Method: operative principle and theory
2.4. Airborne Electro Magnetic (AEM) Method: operative principle and theory
2.5. Bibliography
SECTION II: HARDWARE ARCHITECTURE AND SURVEYING
3. Instruments to carry out a GPR survey
3.1. GPR: Systems architecture
3.2. Designing a survey
3.3. Data acquisition
3.4. Data Analysis
3.5. Data Interpretation
3.6. Bibliography
4. Instruments to carry out a FDEM survey
4.1. FDEM: Systems architecture
4.2. Designing a survey
4.3. Data acquisition
4.4. Data Analysis
4.5. Data Interpretation
4.6. Bibliography
5. Instruments to carry out a TDEM survey
5.1. TDEM: Systems architecture
5.2. Designing a survey
5.3. Data acquisition
5.4. Data Analysis
5.5. Data Interpretation
5.6. Bibliography
6. Instruments to carry out an AEM survey
6.1. AEM: Systems architecture
6.2. Designing a survey
6.3. Data acquisition
6.4. Data Analysis
6.5. Data Interpretation
6.6. Bibliography
SECTION III: APPLICATIONS
7. Case study
7.1. FDEM: Cavity and metallic body search in a landfill area
7.2. FDEM: UXO search in a new building area
7.3. FDEM: Search of various buried object in a trial field, under controlled conditions
7.4. FDEM: Metallic elements search in a building area
7.5. GPR: Large area archaeological survey
7.6. GPR: Rebars detection in concrete slab
7.7. GPR: Utility mapping
7.8. TDEM: Geological study search
7.9. AEM: Volcanogenic Massive Sulfide (VMS) search in open pit
7.10. AEM: Saline water ingress for hydrologic study
7.11. Bibliography
8. Planning and logistics aspect
8.1. Planning of a survey campaign and mobilization aspects
8.2. Instruments packing and shipping to site
8.3. Instruments clearance
8.4. Instruments stocking and handling on site
8.5. Demobilization of human and material assets from site
8.6. Bibliography
9. CONCLUSION